This Weisshorn single sleeping bag suits camping, hiking and road trips. It measures 213cm x 75cm, giving adults plenty of room to stretch out. Its pink finish comes with a matching carry bag, so the bag packs down into a compact size for transport.
The 190T polyester shell is filled with 500g/m² hollow fibre and lined with soft polyester pongee, which keeps it soft, light and water-resistant. A two-way zipper at the bottom lets you ventilate your feet, and the adjustable drawstring hood helps keep you snug on cold nights.
Features
- 500g/m² hollow fibre filling
- Soft polyester pongee lining
- Lightweight and easy to carry
- Water-resistant fabric
- Colourful pink design
- Adjustable tightening strap
- Velcro secure closure
- Double opening zippers
- Comes with a carry bag
Specifications:
Color: Pink
Material: 190T polyester ripstop
Filling: 500gsm hollow fibre
Lining: 190T polyester pongee
Temperature range: -5 degrees to -20 degrees
Comfort rating: 10 degrees
External dimensions: 213m (L) x75cm (W)
Packed dimensions: 27m (D) x45cm (H)
Weight: 2kg
Package Content
Single Sleeping Bag x 1
Carry bag x 1
This product comes with 1 year warranty